- 20
- Jul
What operations should be performed for the empty car test run of the mutton slicer?
What operations should be performed for the empty car test run of the pangiris daging wedhus?
1. Add lubricating oil: add lubricating oil to the sliding guide rail with the oil can brought with you. Refueling position: Push the meat carrier to the left. Refueling of the gearbox. The oiling depth is 25-30 mm. The oil has been added when the mutton slicer leaves the factory. After that, the oil should be replaced with new oil once a year according to the specified oil number. The electronic switch has a phase sequence protection function, (to ensure that the knife cannot be reversed) after the power is turned on, if the phase sequence is incorrect, the fault light will be on and the motor will not rotate. At this time, a professional should be asked to adjust the phase sequence. After the adjustment is completed, make sure that the turning direction of the knife is consistent with the turning arrow on the machine before performing the following operations.
2. Trial operation with empty car: Before starting the mutton slicer, observe whether there is any sundries in the meat loading platform and whether there is a possibility of collision with the meat loading platform. If there is no error, turn on the start button of switch 2 to start the machine. Turn the knife first, the knife runs normally and there is no sound of friction.
Carrying out the test run of the mutton slicer empty car is mainly to test the normal use of the machine, to prepare for production, and to make early judgments for timely repair and maintenance.