- 17
- Jan
Factory process of mutton slicer
Factory process of मटन स्लाइसर
1. Under the premise of the water quality treatment of the softened water, the water in the mutton slicer system and the water quality of the softening tank must first be carefully checked. If it is determined to be qualified, it can be injected.
2. Some new systems cannot be used alternately with the mutton slicer immediately. First, the new system needs to be operated at a specified time period, and after it has an operating mode, it can be incorporated into the system for use.
3. Keep the pipe network clean, whether before or after work, to make the lamb slicer run smoother.